True or False: Power should be removed from the circuit before measuring resistance.

Prepare for the LMS Substation Level II Test with flashcards and multiple-choice questions. Detailed explanations and hints for enhanced learning. Ace your exam with confidence!

Multiple Choice

True or False: Power should be removed from the circuit before measuring resistance.

Explanation:
Power should be removed from the circuit before measuring resistance, and this statement is true. When measuring resistance, it is crucial to ensure that there is no voltage present in the circuit. This is because a live circuit can lead to inaccurate resistance readings due to the influence of current flow. Additionally, attempting to measure resistance while power is applied can potentially damage the multimeter or the circuit itself, as the device is not designed to handle voltage when measuring resistance. Therefore, de-energizing the circuit is a standard safety procedure that ensures accurate measurements and protects both the measuring instrument and the circuit components.

Power should be removed from the circuit before measuring resistance, and this statement is true. When measuring resistance, it is crucial to ensure that there is no voltage present in the circuit. This is because a live circuit can lead to inaccurate resistance readings due to the influence of current flow. Additionally, attempting to measure resistance while power is applied can potentially damage the multimeter or the circuit itself, as the device is not designed to handle voltage when measuring resistance. Therefore, de-energizing the circuit is a standard safety procedure that ensures accurate measurements and protects both the measuring instrument and the circuit components.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy